• Technical Challenges and Prepara
    2025-09-23 Technical Challenges and Prepara

    Technical Challenges and Preparatory Work for the Mountain-Top Hotel Project (Tent Hotel, Clubhouse, and Art Center)I. Technical Challenges

    read more >
  • Gansu Lintao Skating Hall exteri
    2024-11-06 Gansu Lintao Skating Hall exteri

    The entire construction process was accompanied by 3D scanning and verification, allowing real-time comparison of deviations between the design model and the actual construction.Welds, embedded component pullout strength, and glazing installation stability were regularly inspected.Upon completion, the entire cu...

    read more >
  • Production technology and on-sit
    2024-11-06 Production technology and on-sit

    During the design phase, 3D modeling was performed using Rhino software, combined with Grasshopper‘s parametric tools to precisely segment the sphere‘s surface. By integrating the BIM platform with construction drawings, the sphere‘s outer skin was divided into several hyperbolic aluminum panels. Each panel was uniquel...

    read more >
  • Construction process of hyperbol
    2024-11-06 Construction process of hyperbol

    Create a complete wave-shaped hyperbolic surface model in Rhino and parametrically decompose the curvature.* Divide the overall surface into machinable glass units and steel structure skeleton modules, assigning each panel a unique number.* Output 3D coordinate data for each node as a baseline for on-site layou...

    read more >
  • Sleep is the best way to beauty
    2024-11-01 Sleep is the best way to beauty

    Many people are learning all kinds of beauty and skin care knowledge. It is not difficult to have beautiful and healthy skin. As long as you have enough rest, you have already taken the first step to success. If you can

    read more >
    A total of 1 pages 5

Leave Your Message


Leave a message